News

Grangegorman Campus new development, Dublin.

John Sisk & Son appointed Relinea to supply & install GRP RiseGuard flooring. The Grangegorman Campus is a new development that will bring together the activities for the Dublin Institute of Technology (DIT) in one

DRAMATIC Rise in structural steel prices again!

Yet another DRAMATIC RISE in Structural Steel prices! £260/tonne, 12 weeks lead time…GRP Structural Products and Grating is even ‘the more’ ideal solution you need. Contact us TODAY! 028 9447 0010 or email info@relinea.com GRP could

Constructionline Gold Membership

Being a Gold Member we now have complete access to more opportunities, variety of ‘Meet the Buyers’ events as well as enhanced pre-qualification, all Gold members are assessed for SSIP. Constructionline Acclaim team are accredited

Capital Dock Development Project

Download the Capital Dock Case Study The Capital Dock Project in the Docklands area of Dublin is the largest single construction site built in Ireland.  The development consists of 7 separate buildings ranging from 2

CERN Research Laboratory, Geneva

CERN – The European Organization for Nuclear Research based in Geneva in Switzerland is the largest particle physics laboratory in the world. Relinea won a tender to Design and Install a 660m2 GRP Support Frame

GRP vs Concrete – Trench Covers

Trench Covers are designed for covering apertures, bores or trenches during construction projects allowing safe access around site excavations for pedestrian and light vehicular access whilst protecting ducting below. Traditionally, trench covers were made from

Corrosion – What is the real cost?

The Cost of Corrosion to UK Businesses currently stands at a staggering £46 billion per annum – this includes downtime, maintenance and replacement of material. This is the equivalent of 763,600 social homes or another

Scroll to Top