Heathrow Airport Substation Upgrade Project Case Study

Have you read our case study on the Heathrow Airport Substation Upgrade project?

Relinea was specified by Mott MacDonald the design consultant of the project to supply glass reinforced plastic (GRP) structural products for the HV West Intake Replacement – part of the substation upgrade component of the C5 Western Access to London Heathrow Airport scheme on behalf of Network Rail.

Balfour Beatty the main contractors of the project sub-contracted Relinea to design, fabricate and install non-conductive and light weight GRP open mesh grating, support beams, handrail and access platform.

Read the full case study project

You may be interested in...

GRP in Electrically Sensitive Environments

GRP in Electrically Sensitive Environments

GRP in Electrically Sensitive Environments   GRP grating, platforms, handrails, walkways and structures for substations, power stations, data centres and electrical infrastructure.   GRP is used across a wide range

Read More
esigning-Access-Systems-for-Data-Centre-Environments

Data Centre Access Systems

Data Centre Access Systems: Designing Platforms, Walkways & Rooftop Plant Access   Engineered access solutions for data centre environments   Data centre access systems need to do more than provide

Read More
Scroll to Top