Search

AMP8 GRP Access & Platform Design Guide

Share this:

AMP8 GRP Access & Platform Design Guide

 

A practical engineering guide to specifying GRP access systems for water and wastewater infrastructure.

 

With AMP8 driving significant investment across the UK water and wastewater sector, access needs to be considered early in the design of treatment works, pumping stations, reservoirs and other infrastructure.

Relinea has created this guide to help engineers, consultants and contractors understand the key considerations when designing and specifying GRP access systems.

The guide covers:

  • GRP platforms, walkways, stairs and ladders
  • Material selection and corrosion resistance
  • Bespoke access around existing infrastructure
  • Design and structural considerations
  • Specification and technical documentation
  • Early-stage access planning
  • Water and wastewater project examples

View the guide below or download a copy.

 

Need help with an AMP8 access requirement?

 

If you’re working on a project that requires a bespoke GRP access solution, Relinea can support from design and engineering through to manufacture, supply and installation.

Contact Us today.

Water and Wastewater

GRP Access Platforms

You may be interested in...

AMP8 GRP Access & Platform Design Guide

AMP8 GRP Access & Platform Design Guide

AMP8 GRP Access & Platform Design Guide   A practical engineering guide to specifying GRP access systems for water and wastewater infrastructure.   With AMP8 driving significant investment across the

Read More
How to Design a GRP Access Platform

How to Design a GRP Access Platform

How to Design a GRP Access Platform: From Site Survey to Installation   Designing an access platform for an industrial or commercial environment involves much more than selecting a suitable

Read More
Scroll to Top