Grangegorman Campus, Dublin.
At a Glance
Share this:
Client
SISK FCC - Joint venture between John Sisk and JCC Construction
Location
- Dublin
- , Grangegorman
Services
- Installation, Supply
Products
- GRP RiserGuard System
Problem/Challenge
Sisk wanted to use Relinea’s RiserGuard to floor riser voids early in the programme taking advantage of a number of benefits the system can offer.
These included:
- Avoiding the need for the provision of costly and potentially hazardous barriers and edge protection.
- Providing a system that was integrated with M&E, reducing their installation costs.
Solution
Relinea’s RiserGuard system has been designed to suit a variety of floor layouts and in conjunction with our in-house design team, we can adapt our standard designs to suit specific requirements on site.
Coordinating with the M&E contractor, ensured that we installed a flooring system that provided them with a safe working platform whilst incorporating lift-out panels that match the riser layout avoiding the need for remedial fabrication on-site, significantly reducing temporary scaffold and installation costs.
As a result of a successful installation of the GRP RiserGuard flooring in Central and East Quad, Sisk appointed Relinea to supply the Roof Top access platforms which are detailed in a separate case study.